
B2B 手机农场采购
采购规格(中英对照)
采购规格说明
下单前 12 个硬件问题
最终数值以书面 proforma 为准 — 请附带以下信息索取报价。
- 1
设备尺寸
Device dimensions (L × W × H)
Chassis outer dimensions depend on slot count, phone height, and generation — confirmed on written quote and optional datasheet. We do not publish one fixed size for all SKUs.
- •Standard Phone Farm Box: slot layout and rack footprint confirmed before build.
- •Empty chassis / custom cabinet: send board or phone dimensions — mount spacing on datasheet.
- •Export shipping dimensions (carton L×W×H) provided after packing plan is confirmed — useful for freight booking.
- •Request “datasheet with dimensions” on your RFQ if procurement needs sign-off before payment.
- 2
重量
Weight (packed / invoice)
Packed weight varies by slot count, phones on BOM, and crated vs carton export. Commercial invoice weight and carton size are confirmed before shipment.
- •Empty chassis orders weigh less than phone-included or turnkey builds.
- •Custom cabinets and multi-box sea freight: weight on proforma for forwarder quotes.
- •Packing photos can include scale reference when requested on RFQ.
- •Air vs sea freight planning: see export shipping guide for $/kg tradeoffs.
- 3
功耗
Power consumption
PSU wattage is sized from your BOM — node type, charge state, and workload. Plan with ~8 W per Android node as a starting range; final load note on proforma.
- •Each chassis has a unified AC input; internal distribution to slots and hub.
- •Mirror-heavy farms draw more host-side power; headless motherboard nodes often lower per slot.
- •Room HVAC plus chassis fan kit both matter above ~30°C ambient.
- •Use the Power Consumption Estimator with your target node count before RFQ.
- 4
电压
Voltage & plug standard
110 V, 220 V, or 220–240 V regional PSU and plug type confirmed on quote from destination country — not assumed from catalog list price.
- •North America, EU, UK, AU, and SEA plug standards supported when declared on RFQ.
- •PSU module and mains lead matched to proforma — wattage sized from device list.
- •Mixed-voltage rooms (e.g. US gear in EU facility): note on inquiry for adapter vs native PSU.
- 5
支持什么手机型号
Supported phone models
Android and iPhone paths are quoted per model list — board footprint, USB/OTG mode, ROM path, and SIM/camera needs. Catalog gallery shows common mounts; not an exclusive-only list.
- •Send target models on RFQ — we confirm slot compatibility and power draw before quote.
- •Catalog gallery includes Samsung S8, S9, Note 8/9/10, S10/S20/S21 FE, OnePlus, Pixel — cluster mix on quote.
- •One phone family per chassis is typical; mixed models may need hybrid wiring on quote.
- •Motherboard / headless nodes: board model list and footprint required.
- •iPhone farms use separate chassis and host tooling — confirmed on iPhone SKU proforma.
- 6
一台电脑控制多少盒
How many boxes can one PC control?
Most buyers run 1 control PC per 1–3 standard Android boxes when using screen mirroring; ADB-light workflows may reach 4–6 boxes with PCIe USB controllers. Each box uses one hub uplink to the host.
- •Plan by total mirrored nodes (often 20–40 Android nodes per well-specced PC) as much as box count.
- •One industrial hub tree per box → one dedicated host USB3 uplink; avoid consumer hub daisy-chains.
- •Heavy scripts, live mirror, or iPhone stacks usually need a second PC sooner.
- •Send box count, nodes per box, and software name on RFQ — host sizing note on proforma.
- 7
交货时间
Lead time & delivery
In-stock standard chassis: 3–5 business days dispatch after payment. Custom node mix: 7–15 days. iPhone / custom cabinet longer. Air +3–7 days transit; sea 15–30 days.
- •Written quote includes production slot and ship-by window before you pay.
- •Bulk phased ship (chassis sea, devices air) available on project SKUs.
- •Express courier or sea freight per buyer instruction on proforma.
- •Import duties buyer responsibility unless DDP stated on invoice.
- 8
包装方式
Packing method
Foam-lined export cartons with shock padding; rack/cabinet orders may use crated freight. Packing list matched to proforma BOM — confirmed before export packing closes.
- •Typical lines: chassis, hub/wiring kit, PSU, cooling, cables, software notes per order terms.
- •Phone-included builds list devices separately on packing list when agreed.
- •Sea freight multi-box: pallet or crate plan on quote.
- •Commercial invoice includes weights for forwarder booking.
- 9
质保多久
Warranty duration
Chassis and PSU: typically 12 months against manufacturing defects. Fan kits often 6 months. Phones follow supply terms on invoice. Exact text on your proforma.
- •Misuse, unauthorized mods, and buyer-caused damage excluded.
- •OEM network gear: pass-through supplier terms where applicable.
- •Remote setup: re-training window (e.g. 14 days) when listed on service line.
- •Extended maintenance optional for 24/7 production racks.
- 10
坏了怎么处理
Defects, DOA & returns
Report DOA within 48 hours with photos. Manufacturing defects within 7 days of receipt. RMA replacement or parts after inspection — return freight rules on proforma.
- •Shipping damage: photos of carton and product within 48 hours.
- •Spare fan/PSU/cable lines on first bulk order reduce air-freight on single-part RMA.
- •Custom or deployed hardware may require buyer-paid return freight.
- •We do not guarantee platform account outcomes — hardware RMA separate from workflow results.
- 11
发货前能不能拍照
Pre-shipment photos
Yes — request on RFQ or quote reply. Carton exterior and foam layout photos provided after packing plan is confirmed, often before shipment for bulk buyers.
- •Contact form includes “packing photo” checkbox.
- •Quote process step 5: assembly, test & packing photos when requested.
- •Packing list sign-off against proforma before export packing closes.
- •Shipping size/weight shared alongside photos for freight approval.
- 12
能不能远程安装
Remote installation / setup
Yes — optional remote setup service after delivery. Covers USB/hub wiring, device visibility, and batch-control handoff. Does not include operating your accounts or proxies.
- •Buyer prepares: powered hardware, host PC with admin access, stable internet for screen share.
- •Scope tied to device count and session length on proforma.
- •Pre-ship validation in Guangzhou; remote session usually post-delivery when host PC is ready.
- •Product SKU: Remote Control Setup — add on RFQ or order separately.
发送 RFQ — 获取书面 BOM
Send device count, models, connection mode, voltage region, and shipping country. Written quote before assembly — lead time confirmed on quote.