← Help CenterOrders & Payment
How to Request a Phone Farm Hardware Quote
Phones Farm Box is a quote-based B2B hardware supplier. Assembly starts only after you approve a written proforma.
**Step 1 — Choose your starting SKU**
Browse the catalog: phone farm box, motherboard rack, empty chassis, iPhone farm cluster, or accessories. You do not need a final BOM to open an inquiry.
**Step 2 — Submit an RFQ**
Use the contact form or WhatsApp with:
- Target quantity and shipping destination
- Connection mode: USB, OTG, hybrid, or not sure
- Voltage region: 110V, 220V, 220–240V, or not sure
- Empty chassis vs phone-included vs BYO devices
- Target phone or board models (or ask for recommendation at quote)
- Use case: app testing, QA lab, social media team ops, multi-device management, etc.
- Payment preference and documentation needs (datasheet, packing photo, shipping size)
**Step 3 — Configuration review**
Sales confirms chassis layout, hub/PSU tier, and wiring path. Missing details may trigger a follow-up before quoting.
**Step 4 — Written quote**
You receive a BOM, lead time confirmed on quote, packing list outline, freight estimate, and accepted payment methods. Phone-included and iPhone farm orders typically need longer lead time after model review.
**Step 5 — Payment & production**
USDT (TRC20) is manually confirmed by sales after tx hash. Bank transfer, Wise, or PayPal may be offered on invoice. Wallet details are sent in the written quote only.
No platform outcome guarantees — we supply hardware and optional remote setup support.
Need More Help?
Send device count, models, connection mode, voltage region, and shipping country. Written quote before assembly — lead time confirmed on quote.
Quote process at a glance
- 1Submit your RFQ — Share target product or SKU, device quantity, shipping destination, connection mode (USB / OTG / hybrid), voltage region, and use case via the contact form or WhatsApp.
- 2We confirm configuration — Sales reviews phone or board models, chassis layout, hub/PSU tier, and USB or OTG workflow. Missing details may trigger a follow-up before quoting.
- 3Written quote on proforma — You receive a BOM with line items, lead time confirmed on quote, packing list outline, freight method, and accepted payment options — assembly starts only after you approve.
- 4Confirm payment & invoice — Choose USDT TRC20 (manually confirmed by sales), bank transfer, Wise, or PayPal where offered on your invoice. Wallet address and payment instructions are provided in the written quote or sales confirmation only.
Delivery after payment
- 1Quote confirmation — You approve the written BOM, connection mode, voltage region, and lead time on proforma before any assembly slot is reserved.
- 2BOM and invoice confirmation — Final line items, payment method, and shipping destination are locked. USDT payments are manually confirmed by sales after tx hash — not automatic on-chain verification.
- 3Assembly and wiring — Chassis prep, hub/PSU install, and USB or OTG harness routing per your quoted configuration — slot map fixed before wiring starts.
- 4Power and connection check — Slot-by-slot power-on and PC → hub → node data path verification before burn-in.
- 5Burn-in and basic operation test — Loaded run duration depends on product class and order terms — checklist signed before packing when included on invoice.