← Back to GuidesApplications & Use Cases · 2026-05-05
QA Lab Phone Farm Configuration Guide
QA labs prioritize repeatable installs, stable USB, and traceable pre-ship checks over social-style account isolation.
**Hardware fit:**
- Motherboard boxes for headless APK and regression loops
- Phone boxes when camera, SIM, or sensor paths are in test scope
- Hub tier sized for parallel APK push, not idle monitoring only
**Workflow:**
1. Flash or install build via batch tool
2. Run automated test suite per node group
3. Log failures with slot ID — chassis labeling helps
**Burn-in paper trail:**
Request checklist sign-off for audit — note on RFQ for enterprise QA procurement.
**Scaling:**
Add identical chassis stacks for parallel CI lanes; keep hub/PSU SKU consistent for spare pooling.
See App Development & QA solution page; send test matrix (OS versions, node count) on Contact for BOM.
Request a Hardware Quote
Send device count, models, connection mode, voltage region, and shipping country. Written quote before assembly — lead time confirmed on quote.