← Back to GuidesHardware & Selection · 2026-06-06
Phone Farm Equipment Checklist — Hub, PSU, Cooling & Network BOM
**Phone farm equipment** is more than the chassis. Use this checklist when building a BOM for RFQ or internal procurement.
**Core hardware**
- [ ] Phone farm box or motherboard box chassis (slot count on quote)
- [ ] Industrial USB hub tier — one uplink per box to host PC
- [ ] PSU module — wattage from node list + 110V/220V region
- [ ] Cooling fan kit — CFM target for ambient and node load
- [ ] Data cables and regional mains lead
**Host & software**
- [ ] Control PC — 8+ cores, 32GB+ RAM for large mirror farms
- [ ] PCIe USB 3.x cards when exceeding onboard ports
- [ ] Batch-control or ADB stack (buyer-owned unless on proforma)
**Optional network layer**
- [ ] Industrial router/switch for segmented device groups
- [ ] OTG Ethernet offload on large Android farms
**Documentation to request**
- [ ] Wiring diagram PC → hub → node
- [ ] Burn-in checklist (standard box orders)
- [ ] Packing list + invoice weights before export
Copy fields into /tools/bulk-quote-checklist or Contact RFQ. Accessory SKUs: /products/usb-hub, /products/power-supply-solution, /products/cooling-solution, /products/network-equipment.
Request a Hardware Quote
Send device count, models, connection mode, voltage region, and shipping country. Written quote before assembly — lead time confirmed on quote.